Why Tanzania · infrastructure and resources

Energy & LNG: operating system first, project gates second.

Electricity and domestic gas have operating records. LNG remains an event-driven sequence of agreements, engineering and investment gates; a resource statement is not a construction timetable.

Tracked to the official source's own cadence, not presented as a streaming feed. Every chart keeps its observation date, unit and scope attached.

Evidence set checked .

Cadence: Quarterly regulatory update

Official source

As at · Source: Energy and Water Utilities Regulatory Authority

Officially reported gas resource base

57.54 TCF

Government-reported resource base; not labelled as proved 2P reserves. Period: 2026-03-21.

Official source

As at · Source: Ministry of Energy

What supplied the reported electricity mix?

Electricity generation and import mix

As at 31 Mar 2026 · Source: Energy and Water Utilities Regulatory Authority. Exact values and method remain in the static evidence table below.

How has the officially reported gas-supply total changed?

Natural-gas supply

As at 30 Jun 2025 · Source: Energy and Water Utilities Regulatory Authority. Exact values and method remain in the static evidence table below.

Where was reported natural gas consumed?

Natural-gas consumption by use

As at 30 Jun 2025 · Source: Energy and Water Utilities Regulatory Authority. Exact values and method remain in the static evidence table below.

Event-driven tracker · checked 2026-09-05

Tanzania LNG: the gates, not a guessed completion date

The tracker advances only when a dated official source evidences the next gate. “Not evidenced” is not a prediction that the gate will fail; it is the current public record.

  1. In progress

    Host Government Agreement process

    Official engagement records continued negotiation and finalisation work.

    Official source

    As at · Source: Ministry of Energy

  2. Not yet evidenced

    Front-end engineering design

    PURA places FEED after HGA completion; no official start evidence located by the checked date.

    Official source

    As at · Source: Petroleum Upstream Regulatory Authority

  3. Not yet evidenced

    Final investment decision

    No official FID evidence located by the checked date.

    Official source

    As at · Source: Petroleum Upstream Regulatory Authority

  4. Not yet evidenced

    Construction start

    No official construction-start evidence located by the checked date.

    Official source

    As at · Source: Petroleum Upstream Regulatory Authority

  5. Not yet evidenced

    First LNG

    No official first-LNG evidence located by the checked date.

    Official source

    As at · Source: Petroleum Upstream Regulatory Authority

Resource language matters

57.54 TCF is the officially reported resource base.

This page does not relabel it as proved 2P reserves, recoverable LNG, project capacity or future export volume.

Related operating series

Fuel is tracked on its own monthly clock.

EWURA maximum retail caps are regulated fuel-price observations, not a proxy for LNG progress or upstream economics.

Explore the fuel-price record →

What the public record supports

Reading the evidence without outrunning it

Power system

Capacity and demand are now visible together.

The regulatory snapshot reports 4,609.66 MW of installed capacity under its stated scope and gross maximum demand of 2,508.19 MW. The gap is not a reserve-margin calculation without availability and network constraints.

Domestic gas

Power remains the principal reported use.

FY2024/25 end-use shares show 74.43% for power generation and 24.65% for industry, grounding the gas story in current domestic use.

LNG

Milestones are the honest update layer.

Agreements, FEED, FID and construction are discrete official events. Tracking them is more truthful than manufacturing a continuous numeric project series.

Freshness contract

What updates, and when

“Latest” means the newest verified observation the named authority has published. A source check never advances an observation date.

Quarterly regulatory update

Electricity capacity, demand and generation

Installed capacity including own-use and imports; gross maximum demand; July to March generation and imports.

Official source

As at · Source: Energy and Water Utilities Regulatory Authority